系统地管理测试资源/Systematically manage test resources
Peak Resource Planner 是一个软件解决方案,它可以集中管理试验台架生命周期,测量设备 (例如 I/O 模块、 传感器、 假人和板台),测试部件和测试车辆。系统存储不同类型的资源的所有相关信息。它们包括,例如,站点、 可用性、校准和维护的状态。可以在任何时候添加如装配规程、 设备图像或测试报告的补充文件。
The Peak Resource Planner is a software solution with which you can centrally manage the life cycle of test benches, measuring equipment (e.g. I/O modules, sensors, dummies and pallets), test parts and test vehicles. The system stores all relevant information about the different types of resource. These include, for example, site, availability and calibration and maintenance state. Complementary documents such as assembly regulations, device images or test reports can be added at any time.
单个资源显示为树形结构化的资源组件以及详细伴随信息。这种方式,您可以轻松映射任何对象结构。
The individual resources are shown as a tree with hierarchically-structured resource components and the accompanying detail information. This way, you can map any object structure without further ado.
资源的装配状态可以在任何时候进行追踪
The assembly state of a resource can be traced at any time.
如果您需要我们将很乐意提供更多的细节
We will be happy to provide more details if you need them.
Peak Resource Manager特点/
Essential features of the Peak Resource Manager:
区分不同的资源类型
Can distinguish between different resource types
自由定义属性的帮助下资源描述
Description of resources with the help of freely definable attributes
从现有的系统 (如 SAP) 导入资源信息
import resource information from pre-existing systems (e.g. SAP)
资源组件结构的分级描写
Hierarchic portrayal of resource component structures
单独资源部件的管理
Management of individual resource parts
资源附加信息要素的管理 (例如。 测试点,传感器等)
Management of additional information elements of a resource (e.g. measuring points, sensors, etc.)
资源评论管理
Management of comments about resources
补充文件管理
Management of complementary documents
资源装配情况的各项对比
Per-item comparison of the resource assembly states
“冻结"资源装配状况 (版本管理)
“Freezing” the assembly state of resources (version management)
资源装配状况修改纪录
Revision history of resource assembly states
管理资源状况
Managing resource statuses
资源使用的证明
Proof of use of resources
导出报告到Excel
Export reports to Excel
openMDM® 和Peak Resource Planner 接口
openMDM® and Peak Resource Planner interfaces
您的位置:汽车测试网 - Peak Solution - 服务与产品
PRM 资源管理
发布时间:2021-03-18 19:16:06