Horiba establishes state-of-the-art US$12m battery test facility

Horiba is building a new US$12m test facility for batteries and fuel cells at the Horiba Biwako E-Harbor site in Otsu City, Shiga Prefecture, which will enable it to better respond to future test requirements.
The facility includes laboratories dedicated to battery cell analysis, modules, and packs equipped with the latest test equipment including test systems for charge-discharge cycle evaluation and thermal management climatic durability analysis.
By establishing the laboratories within the existing E-Lab at Horiba Biwako E-Harbor, engineers will be able to work with others from the powertrain department where conventional engines and drivelines are developed, on the evaluation of batteries and battery management systems.
编辑推荐
最新资讯
-
推荐性国家标准《乘/商用车电子机械制动卡
2025-04-30 11:13
-
载荷分解
2025-04-30 10:46
-
布雷博在上海开设亚洲首个灵感实验室
2025-04-30 10:25
-
组分性能对锂离子电池卷芯挤压力学响应的影
2025-04-30 09:00
-
美国发布自动驾驶新框架,放宽报告要求+扩
2025-04-30 08:59