Horiba establishes state-of-the-art US$12m battery test facility

Horiba is building a new US$12m test facility for batteries and fuel cells at the Horiba Biwako E-Harbor site in Otsu City, Shiga Prefecture, which will enable it to better respond to future test requirements.
The facility includes laboratories dedicated to battery cell analysis, modules, and packs equipped with the latest test equipment including test systems for charge-discharge cycle evaluation and thermal management climatic durability analysis.
By establishing the laboratories within the existing E-Lab at Horiba Biwako E-Harbor, engineers will be able to work with others from the powertrain department where conventional engines and drivelines are developed, on the evaluation of batteries and battery management systems.
编辑推荐
最新资讯
-
测迅乌镇&盐城测试场:助力智能网联汽车标
2025-02-22 12:39
-
使用示波器对三相电机驱动器进行测量
2025-02-22 12:37
-
上汽集团大乘用车重磅招聘
2025-02-22 12:25
-
GB/T 44173-2024对开门预警DOW的要求
2025-02-22 12:25
-
声音工程:像用PS一样编辑声音
2025-02-21 17:04